Lot 56: Carmel Valley

The lot: 2.5 acres. 940’ Elevation. 15 miles from the mouth of the Carmel River. Just past Carmel Valley Village. In the Los Tulares neighborhood.

Jump to Latest Post

From the East on the left, to the South, to the West on the right.

From the East on the left, to the South, to the West on the right.

After the trees were “lifted”

After the trees were “lifted”

The Inspiration: To build a steel house with minimal disturbance to the land. Large open interior spaces with glass walls facing south looking over the Santa Lucia Mountains. We found Blue Sky Building Systems https://blueskybuildingsystems.com/

Screen Shot 2019-06-15 at 10.53.39 AM.png
To experience the Blue Sky System we stayed in the Graham House.

To experience the Blue Sky System we stayed in the Graham House.

It’s located in Yucca Valley and available on AirBnB Graham Residence

It’s located in Yucca Valley and available on AirBnB Graham Residence


The Idea: We wanted to fit the house in between the 30+ trees. We had soils, septic, and fire department out prior to purchasing thanks to our real estate agent Kim DiBenedetto https://www.kimnegotiateshomes.com/

Sketches we made and reviewed with the Monterey County planners before purchasing the lot

Sketches we made and reviewed with the Monterey County planners before purchasing the lot

Sketches we made and reviewed with the Monterey County planners before purchasing the lot

Sketches we made and reviewed with the Monterey County planners before purchasing the lot


The Architect: Blue Sky connected us with Andrew Goodwin (from San Luis Obispo) who already new the Blue Sky system & was willing to collaborate with us on our vision www.andrewgoodwin.us

Andrew's south view b&w render.jpg
We made a foam core model from the plans.

We made a foam core model from the plans.

Foamcore-NE-view.jpg

“Story poles” were required by the county.

“Story poles” were required by the county.


Construction: Andrew connected us with KGM Construction (also from San Luis Obispo). www.kgmconstruction.com

Driveway cut-in

Driveway cut-in

Septic field finished

Septic field finished

Blue Sky Building Systems setting the first columns

Blue Sky Building Systems setting the first columns

IMG_9773.JPG
Main-House-steel-june-26-2019._1110161.jpg
IMG_9805.JPG
Garage_1110184.jpg

CLICK for VIDEO - Time Lapse - Blue Sky team assembles the system in 7 days

Up on the rooftop

Up on the rooftop

Lower-looking-up-IMG_9941.jpg
Concrete floors poured throughout the house.

Concrete floors poured throughout the house.

Click for Video - Pouring the floors

Click for Video - Framing the Walls in 3 days with a crew of 8

IMG_0742.JPG
IMG_0990.JPG
IMG_1809.JPG
Hardie Panels

Hardie Panels

Paint: Thunder Grey

Paint: Thunder Grey

Drywall is done. Ram Board is covering the finished concrete floors.

Drywall is done. Ram Board is covering the finished concrete floors.

The front door area.

The front door area.

The kitchen takes shape.

The kitchen takes shape.

Christmas Day Lunch by the fireplace

Christmas Day Lunch by the fireplace

IMG_2862.JPG
IMG_3221.JPG
Looking East

Looking East

IMG_3563.JPG
IMG_0038.JPG
IMG_0096.JPG
IMG_0089.JPG
IMG_0997.JPG
IMG_1127.JPG